{"id":52,"date":"2025-11-07T09:43:27","date_gmt":"2025-11-07T15:43:27","guid":{"rendered":"https:\/\/blog.unmc.edu\/construction\/?p=52"},"modified":"2025-11-07T09:43:28","modified_gmt":"2025-11-07T15:43:28","slug":"fall-2025-update-hsec-ii","status":"publish","type":"post","link":"https:\/\/blog.unmc.edu\/construction\/2025\/11\/07\/fall-2025-update-hsec-ii\/","title":{"rendered":"Fall 2025 update, HSEC II"},"content":{"rendered":"<div class=\"panel body-content\"><div class=\"panel__container\">\n<p>What&#8217;s new at Health Science Education Center II, in the Douglas A. Kristensen Rural Health Education Complex? Interior finish work continues, including completion of the sculptural ceiling feature at the second\u00a0floor. Interiors of classrooms on second\u00a0and third\u00a0floors are receiving final paint. Exterior pavers and hardscape work continues on both southeast and west sides of the building.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/blog.unmc.edu\/construction\/wp-content\/uploads\/sites\/71\/2025\/11\/kearney-constr1-1024x768.jpg\" alt=\"\" class=\"wp-image-54\" srcset=\"https:\/\/blog.unmc.edu\/construction\/wp-content\/uploads\/sites\/71\/2025\/11\/kearney-constr1-1024x768.jpg 1024w, https:\/\/blog.unmc.edu\/construction\/wp-content\/uploads\/sites\/71\/2025\/11\/kearney-constr1-300x225.jpg 300w, https:\/\/blog.unmc.edu\/construction\/wp-content\/uploads\/sites\/71\/2025\/11\/kearney-constr1-768x576.jpg 768w, https:\/\/blog.unmc.edu\/construction\/wp-content\/uploads\/sites\/71\/2025\/11\/kearney-constr1-1536x1152.jpg 1536w, https:\/\/blog.unmc.edu\/construction\/wp-content\/uploads\/sites\/71\/2025\/11\/kearney-constr1.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Exterior paver work.<\/figcaption><\/figure>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"alignright size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"787\" height=\"788\" src=\"https:\/\/blog.unmc.edu\/construction\/wp-content\/uploads\/sites\/71\/2025\/11\/kearney-constr2.jpg\" alt=\"\" class=\"wp-image-55\" style=\"width:579px;height:auto\" srcset=\"https:\/\/blog.unmc.edu\/construction\/wp-content\/uploads\/sites\/71\/2025\/11\/kearney-constr2.jpg 787w, https:\/\/blog.unmc.edu\/construction\/wp-content\/uploads\/sites\/71\/2025\/11\/kearney-constr2-300x300.jpg 300w, https:\/\/blog.unmc.edu\/construction\/wp-content\/uploads\/sites\/71\/2025\/11\/kearney-constr2-150x150.jpg 150w, https:\/\/blog.unmc.edu\/construction\/wp-content\/uploads\/sites\/71\/2025\/11\/kearney-constr2-768x769.jpg 768w\" sizes=\"auto, (max-width: 787px) 100vw, 787px\" \/><figcaption class=\"wp-element-caption\">A classroom interior.<\/figcaption><\/figure>\n<\/div><\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>What&#8217;s new at Health Science Education Center II, in the Douglas A. Kristensen Rural Health Education Complex? Interior finish work continues, including completion of the sculptural ceiling feature at the second\u00a0floor. Interiors of classrooms on second\u00a0and third\u00a0floors are receiving final paint. Exterior pavers and hardscape work continues on both southeast and west sides of the [&hellip;]<\/p>\n","protected":false},"author":1233,"featured_media":53,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-52","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/blog.unmc.edu\/construction\/wp-json\/wp\/v2\/posts\/52","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blog.unmc.edu\/construction\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blog.unmc.edu\/construction\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blog.unmc.edu\/construction\/wp-json\/wp\/v2\/users\/1233"}],"replies":[{"embeddable":true,"href":"https:\/\/blog.unmc.edu\/construction\/wp-json\/wp\/v2\/comments?post=52"}],"version-history":[{"count":2,"href":"https:\/\/blog.unmc.edu\/construction\/wp-json\/wp\/v2\/posts\/52\/revisions"}],"predecessor-version":[{"id":57,"href":"https:\/\/blog.unmc.edu\/construction\/wp-json\/wp\/v2\/posts\/52\/revisions\/57"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/blog.unmc.edu\/construction\/wp-json\/wp\/v2\/media\/53"}],"wp:attachment":[{"href":"https:\/\/blog.unmc.edu\/construction\/wp-json\/wp\/v2\/media?parent=52"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blog.unmc.edu\/construction\/wp-json\/wp\/v2\/categories?post=52"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blog.unmc.edu\/construction\/wp-json\/wp\/v2\/tags?post=52"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}