Central Campus Construction
- Week of 6-17-19
- Temp walkways will be installed on south side of jobsite
- Interior work for demolition of connector structure (dock closed 6-18)
- Continuing construction work on Level 3 conference room, bike storage etc. at east wall of auditorium (inside auditorium)
- Starting Level 8 construction work for divider wall, access, egress, life safety. Creation of North storage space.
- Starting demolition of connector structure 6-18(Dock closed)
- Continuing work on Level 3 conference and Level 8 storage
- Week of 6-24-19
- Construction Crane will be delivered.
- Scaffolding erected from Level 5 to Level 8
- Construction work on level 4 offices at back side of auditorium
- Continuing work started 6-17-19
- Week of 7-1-19
- Temp window installation will occur on levels 6, 7, 8,
- Continuing work from 6-24-19
- Week of 7-8-19
- Construction starts on restrooms on Level 2.
- Continuing work from 7-1-19
- Week of 7-15-19
- Continuing work from 7-8-19