Facilities Briefs

LOZIER CENTER FOR PHARMACY

SIDEWALKS CLOSED – NEW ROUTE FOR PEDESTRIAN TRAFFIC

The construction contractor, Hausmann Construction Company, for the College of Pharmacy’s new building is putting up a construction fence around the job site.  Several of the pedestrian walkways have been removed.  Now, from Michael Sorrell Center to Student Life Center you can take the existing sidewalk to the north and follow the signage and it will direct you to the Student Life Center.  (See path shown on attached map.)    

The parking spaces located at the Michael Sorrell Center dock will be closed for the duration of the construction project.

Please use caution and observe any barricades and safety fences around the construction area.

If you have any questions, please contact  Mic Tierney at 402-559-5261.  Since it is vital that everyone working in and around the area be informed, please mention it your colleagues.

2014 July 30 TEMPORARY SIDEWALK FROM SORRELL TO STUDENT LIFE

 

Leave a Reply


six × 4 =