Facilities Briefs

Wittson Hall / McGoogan Library

Third Floor Corridor Closing and Limited Access To Service Elevator E-20 Wittson Hall, third floor corridor that leads south to Bennett Hall will close Saturday, February 16, 2013, for construction.   The corridor will be closed until Monday, March 25, 2013.  Pedestrians who would like to walk on Level 3 to Bennett Hall from Wittson Hall or vice-versa must use the exterior sidewalk along 42nd Street. The service elevator (E-20) and corridor will be closed to all pedestrian use on level 3 through-out the construction.   The… Continue Reading